
Add to Cart
1. The inner tank adopts the international advanced three-return vertical water pipe tubular structure, the flue gas and the fin tube fully flush heat exchange, and the thermal efficiency reaches over 92%.
2. The boiler operating system is fully automatic, and all operating states can be seen at a glance in the LCD screen. You can observe the burner working status, boiler water level status, current temperature, feed pump running status, fault alarm status, etc. in the display, so that you can use it more safely.
3. Equipped with multiple interlocking protection devices such as safety valve, pressure controller and water level control protector, it is absolutely safe and reliable.
4. The unique design of small water volume and large steam enthalpy allows you to obtain steam in the shortest time, with built-in steam-water separation device to ensure high-drying and high-quality steam.
1. Rapid steam generation in 5 minutes, the thermal efficiency can reach more than 90%, the pressure is stable, and the running cost is low.
Fuel Cost analysis(Take 100 kg per hour as an example) | ||||
Equipment selection | Steam volume | Energy consumption | Unit Price | Operating costs |
Electrothermal steam boiler | 100kg | 72 kw/h | 0.08 USD/kw | 10.91 USD |
Fuel steam boiler | 100kg | 7 kg/h | 0.53 USD/kg | 7.42 USD |
Gas steam boiler | 100kg | 8 m³/h natural gas | 0.34 USD/m³ | 5.45 USD |
Biomass steam boiler | 100kg | 20 kg/h wood pellet | 0.08 USD/kg | 3.03 USD |
Industrial food mini wood pellet fired boilers technical | |||||||||||||
Rated evaporation | Rated pressure | Rated steam tempe rature | Feed water temper ature | Design thermal efficiency | Water capacity | Steam outlet | water intake | Drain valve | Dimensions | Shipping weight | Full load biomass consumption | ||
L | W | H | |||||||||||
Kg/h | Mpa | ℃ | ℃ | % | L | DN | DN | DN | mm | mm | mm | T | Kg/h |
300 | 0.7 | 170℃ | 20℃ | 87% | 28 | 25 | 15 | 25 | 2000 | 1400 | 2700 | 1.35 | 49.3 |
500 | 0.7 | 170℃ | 20℃ | 93% | 29 | 32 | 15 | 25 | 2500 | 1800 | 2500 | 4.1 | 76.8 |
1000 | 0.7 | 170℃ | 20℃ | 92% | 29 | 32 | 15 | 25 | 3000 | 2300 | 2500 | 6 | 153.5 |
The industrial food mini wood pellet fired boilers application area:
Application field description:
1. For food industry: food factory, beverage factory, bakery, high temperature milk sterilization, steamed soy milk, steamed steamed buns.
2. For pharmaceutical industry: hospital disinfection, hospital canteen, hospital bath, pharmaceutical equipment heating, cooking medicine.
3. For biological equipment industry: sterilizer, school laboratory, thermal test
our engineering case:
1.Henan Swet Boiler Co.Ltd was established in 1954 ,We have continued to provide customers with more than 60 years of quality service, known as the king of China's boiler.
2.It's the national designated A-class boiler and D1,D2 class pressure vessel manufacturing key enterprises and has passed ISO9001 international quality management certification system certification.It holds level 1 boiler installation permit. National special equipment manufacturing license ,National specialequipment installation remould maintenance permits and so on.
Our Factory
The factory covers an area of 130,000 square meters, of which the construction area is 60,000 square meters. The company has strong technical force. The industrial boiler is the leading product of our company: high-efficiency low-emission energy-saving circulating fluidized bed boiler with various parameters, low-emission energy-saving gas boiler, each Grate industrial boilers, smelting industry and waste heat boilers in hazardous waste industries. Widely used in industrial production in all walks of life, self-supplied power stations, heating and heating.
FAQ:
Q1:How to install a boiler?
A1:This steam generator is factory-assembled and easy to install. It does not require professional installers to install, and it also saves a lot of installation materials.
Q2: How many years is the boiler’s life span?
A2: The boiler is designed for at least 10 years life span, but under good maintenance, usually the boiler can use at least 15 years, Swet Boiler provide full life after-sales service to each sold boiler.
Q3: How to choose a boiler model?
A3: Confirm the type (steam or hot water), capacity, working pressure (or output temperature) and fuel(coal, biomass, gas or oil or other fuel) of the boiler, Swet Boiler will suggest a suitable model based on your usage.
Q4: How is the warranty term?
A4: If any problems caused for quality during the warranty period, the Seller will repair or replace the broken parts for free, if the problem caused from the client’s side, the Seller will help supply the spare part at lowest cost.
Q5: How to get the best price quickly?
A5: We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then confirm the boiler model. (2) The customer needs to provide us with your name, e-mail address and company name, and we will send you a price list immediately. If you use WhatsApp, Skype or WeChat, you can provide us with your ID, which will be more convenient
For our communication.
Q6: Why do you have to believe in the quality of our boilers?
A6:(1). Applied material information strength calculation report;
(2) Non-destructive testing (non-destructive testing) of steel plates, tubes, and electrodes is 100%;
(3) 100% X-ray inspection (welding): to ensure the quality of the entire boiler;
(4). Hydrostatic pressure test: ensuring standard working pressure and safety;
(5). Third party inspection report: Henan Boiler Testing Institute;
(6). Passed ISO:9001 and SGS certificates.
Service purposes:
Pre-sale service:
1. 24 hours phone,email,trademanager online services;
2. We will provide you with high-quality technical solutions, product design instructions.
3. We welcome you to visit our boiler factory to have a look and check;
4. we will answer you all the questions within 24hours;
After-sale service:
1. we will delivery the machine as soon as possible according to your requirement,within 20days;
2. We will send rich practiced experience engineers to you to install and test the machine and train
3. We will give you one year guarantee time after the machine can run well;
4. After one year,we can guide and help you to maintain the machines;